Fixed-Price Subcontracting for Decontamination and Decommissioning of Small Facilities at Oak Ridge National Laboratory

2002 
Abandoned facilities were decontaminated and decommissioned in preparation for final remediation of Solid Waste Storage Area (SWSA) 4 at Oak Ridge National Laboratory. The facilities varied in age from approximately 5 years to more than 40 years, with radiological conditions ranging from clean to highly contaminated with fission products. A fixed-price subcontract (FPSC) was awarded by the U.S. Department of Energy's (DOE's) Environmental Management (EM) Management and Integration (MI demolition of surface structures to slab; stabilization of below-grade structures; waste management and disposal; and preparation of post-D&D regulatory documentation. Using stand-off techniques to the extent possible, building structures and ancillary equipment were prepared for demolition and demolished. A fixative coating system was used in conjunction with continuous water misting to control airborne contamination. Demolition waste consisted of two major streams: clean construction and demolition waste and low-level (radioactive) waste. The debris was size-reduced and packaged, again via remote means. At all times during the D&D, personnel safety, environmental compliance, and as low as reasonably achievable exposure considerations were paramount. Upon completion of D&D activities, each site was inspected and accepted by the M&I contractor. This project is a success story for fixed-price subcontracting of D&D work under DOE's M&I arrangement.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []