Beam from the accelerator for research was available for a total period of 3900 h last year and unscheduled maintenance time was reduced by a factor of almost 2. An arc discharge tube conditioning test was conducted on the top five units of the accelerator and a test with macropulsed beam was accomplished. The main problems during the year were vacuum leaks and voltage ‘‘tics.’’