ENGINEERING CASE OF CONCRETE-FILLED SQUARE STEEL TUBE COLUME FRAME STRUCTURE

2008 
Compared with concrete-filled steel cylinder column,the square one filled with concrete adopted in a business center building in Shanxi has the advantages of simple node,easy manufacture,short construction period and low costs,having good architectural effect and good economical benefit.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []