An approach to the explicit consideration of unreliability costs in transmission expansion planning

2004 
This paper proposes a new methodology to explicitly consider unreliability costs in a multistage transmission expansion planning. Starting from a reference plan, alternative expansion plans are derived based on postponement/anticipation of circuit implementations. These plans are then ranked by using an economic index of merit and the associated Pareto-optimal set is obtained through cost/benefit (trade-off) analyses. The cost/benefit is related to the variation of investments and operational costs of each alternative transmission plan. Besides the usual operational costs (active power losses, fuels, etc.) the unreliability costs, due to random failures in the system, are also considered as operational costs. Therefore, reliability evaluations are carried out for all transmission expansion plans in order to compute reliability indices, such as the expect energy not supplied and loss of load cost. To reduce the computational effort, pruning techniques are used to limit the number of possible transmission expansion plans. The proposed approach is applied to a configuration of the Brazilian Northeastern system, considering a planning horizon of ten years, to identify transmission expansion plans that are more balanced in terms of investment and reliability.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    12
    References
    4
    Citations
    NaN
    KQI
    []