Validation of the Series Power Couplers of the LIPAc SRF Linac

2019 
In the framework of the IFMIF/EVEDA project, the cryomodule of the Linear IFMIF Prototype Accelerator (LIPAc) will be assembled then tested at Rokkasho in 2019. Eight Series Power Couplers (PC) operating at 175 MHz were manufactured under a CEA contract, in order to equip this Cryomodule. They were all successfully RF conditioned up to 100 kW CW in TW and SW configurations. All the high RF power tests were performed under CIEMAT responsibility in BTESA Company premises, according to the CEA requirements. In order to fix difficulties encountered during the fab process, manufacturing and quality control have been analyzed in depth. Thanks to the corrective actions implemented, every PC reached the performances targeted for qualification. This paper will give details about this manufacturing phase and provide an overview of the obtained RF test results.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []