Scheduling method for networked control system with resource constraints based on fuzzy feedback priority and variable sampling period

2018 
A scheduling method based on fuzzy feedback priority and variable sampling period for a networked control system with resource constraints is proposed in this paper. Firstly, each control loop weight is adjusted dynamically according to a control loop data transmission error through a quadratic square root mapping function. A different weight is given for each loop. A fuzzy feedback priority scheduling strategy is designed combined with dynamic weight, system output and system output error rate. The priority of each control loop is adjusted dynamically. Then, considering the current network status, the new network utilization is predicted through proportional control. A least-squares support vector machine (LSSVM) algorithm is used for controlled loop packet transmission time prediction. A variable sampling period for each control loop is determined by using a controlled loop dynamic weight, network utilization and data transmission time. Finally, a fuzzy feedback priority scheduler and variable sampling ...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    21
    References
    6
    Citations
    NaN
    KQI
    []