THERMAL POWER STATIONS 65-MW GAS-TURBINE SYSTEM FOR RENOVATION OF THE MOSÉNERGO TÉTs-9 HEATING AND ELECTRIC POWER PLANT

2009 
Thermal layouts are examined for condensation-type steam-gas systems with one, two, and three boiler-utilizer pressure stages based on the GTE-65 gas-turbine power generating system and the PT 60-12.7 1.27 steam turbine. The operational efficiency and feasibility of integrating a GTE-65 and a Pr-86-13.72-545 boiler-utilizer with a single pressure stage in the existing thermal layout of the TETs-9 plant of Mosenergo (a station with crosslinks) within the main housing at the location of a no longer operating R-50-12.7 1.27 steam turbine and PTVM-100 water heating boiler are demonstrated.