Great Lakes Wind Energy Center (GLWEC) Pilot Project and Applied Research Center
2009
Objective: Based on preliminary turbine locations, produce a conceptual design for the offshore cable array from turbines to interconnection location. Identify cable installation methods and cable cost estimates. A 15-month $1,041,454 feasibility study has been completed for developing the GLWEC. Project Managers: •juwi GmbH & JW Great Lakes Wind LLC Core Team: •Germanischer Lloyd Wind Energy and •DLZ Ohio, Inc. Subcontractors: •Black & Veatch Corp., •Curry & Kerlinger, LLC, •Econnect Group, •BrownFlynn, Inc. 10) Conceptual Design – Germanischer Lloyd