CONSTRUCTION OF SMALL-SCALE MULTIPURPOSE ADS AT ITEP

2001 
A small-scale 100 kW experimental ADS with 36 MeV 0.5 mA proton linac, Be-target and heavy water subcritical blanket assembly is under construction at ITEP. The hybrid system intends for study a number of nuclear energy and neutron physical problems, for study interaction between linac-driver and subcritical assembly, for production of radionuclides.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    3
    Citations
    NaN
    KQI
    []