Delivery and installation of PC/FRAM at the PNC Tokai Works
1997
The authors report on the assembly, testing, delivery, installation, and initial testing of three PC/FRAM plutonium isotopic analysis systems at the Power Reactor and Nuclear Fuel Development Corporation`s Tokai Works. These systems are intended to measure the isotopic composition and {sup 235}U/plutonium of mixed oxide (MOX) waste in 200-L waste drums. These systems provide capability for performing measurements on lead-lined drums.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI