HIE-ISOLDE LINAC: STATUS OF THE R&D ACTIVITIES
2009
For the post-accelerator of radioactive ion beams at CERN a major upgrade is planned to take place in the next 4-5 years. The upgrade consists in boosting the energy of the machine from 3 MeV/u up to 10 MeV/u with beams of mass-to-charge ratio 2.5Wave Resonators (QWRs). Two cavity geometries, “low” and “high” β, have been selected for covering the whole energy range. A R&D program has started in 2008 looking at the different aspects of the machine, in particular beam dynamics studies, high β cavity development and cryomodule design. A status report of the different activities is given here.