Robust material requirement planning with cumulative demand under uncertainty

2017 
AbstractIn this paper, we deal with the problem of tactical capacitated production planning with the demand under uncertainty modelled by closed intervals. We propose a single-item with backordering model under small uncertainty in the cumulative demand for the Master Production Scheduling (MPS) problem with different rules, namely the Lot For Lot rule and the Periodic Order Quantity rule. Then we study a general multilevel, multi-item, multi-resource model with backordering and the external demand on components for the Material Requirement Planning (MRP) problem under uncertainty in the cumulative demand. In order to choose robust production plans for the above problems that hedge against uncertainty, we adopt the well-known minmax criterion. We propose polynomial methods for evaluating the impact of uncertainty on a given production plan in terms of its cost and for computing optimal robust production plans for both problems (MPS/MRP) under the assumed interval uncertainty representation. We show in thi...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    58
    References
    8
    Citations
    NaN
    KQI
    []