Optimization design of water transmission project for Chengbei Waterworks in Yulin City

2006 
At different design stages of the water transmission project for Chengbei Waterworks in Yulin City of Guangxi,optimization and comparison of many design schemes were made before the optimum design and construction scheme was determined,rendering a cost saving of RMB 5.03 million yuan while the expected objective is achieved.The completed and operating project has brought significant benefit.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []