Software Verification and Validation Plan Activities, 2011, Project Number: N6423, SAPHIRE Version 8

2011 
The SV&V Plan experienced changes over the past year to bring it into the operational software life cycle of SAPHIRE 8 and to maintain its sections on design features. Peer review of the SVVP with the former IV&V members identified the need for the operational use of metrics as a tool for quality maintenance and improvement. New tests were added to the SVVP to verify the operation of the new design features incorporated into SAPHIRE 8. Other additions to the SVVP were the addition of software metrics and the PDR and CDR processes. Audit support was provided for the NRC Technical Manager and Project Manager for the NRC OIG Audit performed throughout 2011. The SVVP is considered to be an up to date reference and useful roadmap of verification and validation activities going forward.