Rail deployment operation test for ITER blanket handling system with positioning misalignment

2013 
Abstract R&D for rail deployment equipment was performed for the ITER blanket remote handling system. The target torque for the automatic operation was investigated. The result shows that the 20% of the rated torque is adequate as the torque limitation for the automatic operation. A schedule for the procurement of the blanket remote handling system, which will be delivered to the ITER in 2020, was also shown.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    8
    References
    2
    Citations
    NaN
    KQI
    []