Rail deployment operation test for ITER blanket handling system with positioning misalignment
2013
Abstract R&D for rail deployment equipment was performed for the ITER blanket remote handling system. The target torque for the automatic operation was investigated. The result shows that the 20% of the rated torque is adequate as the torque limitation for the automatic operation. A schedule for the procurement of the blanket remote handling system, which will be delivered to the ITER in 2020, was also shown.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
8
References
2
Citations
NaN
KQI