Pingdingshan Coal Mine Group №.6 Mine Waste Dump Winch Electric Control System Transformation

2010 
Describes Pingmei Group №.6 Mine waste dump winch electric control system of the original problems proposed to the original electronic control system uses the switched reluctance motor and PLC integrated approach to transforming waste dump winch system to achieve elimination of failure, safety in production, improve production efficiency.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []