The new first wall configuration of JET
1993
The installation of the pumped divertor into the JET machine during 1992-1993 includes a total refurbishing of most of the in-vessel components and a new first wall configuration. The paper describes the new components, and the requirements which were implemented in the design. These include the requirements related to normal plasma operation and off-normal effects such as disruptions as well as those related to installation and alignment.