The new first wall configuration of JET

1993 
The installation of the pumped divertor into the JET machine during 1992-1993 includes a total refurbishing of most of the in-vessel components and a new first wall configuration. The paper describes the new components, and the requirements which were implemented in the design. These include the requirements related to normal plasma operation and off-normal effects such as disruptions as well as those related to installation and alignment.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    7
    References
    6
    Citations
    NaN
    KQI
    []