Dual concentric gas-lift completion design for the Thistle field
1991
A unique dual concentric gas-lift completion was installed in two wells in the thistle field during 1987. This paper outlines the completion concept and design, including vertical-lift performance and tubing movement/stress analysis. Results of field performance after 1 year of production history are presented and compared with predicted values.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
1
Citations
NaN
KQI