Recent developments of the Synchrotron Light source at NSRRC

2004 
1) The storage ring operation energy was raised to 1.5 GeV, the maximum value limited by dipole magnets, to improve electron beam lifetime and to extend its spectrum to higher energies in 1996. 2) Five permanent-magnet insertion devices have been constructed and installed, as listed in Table I, by the end of 1999 to provide synchrotron radiation with higher brightness and energies. In 2003, the U10 undulator was removed and loaned to ANKA, Germany. 3) The booster energy was increased from 1.3 to 1.5 GeV. With this accomplishment, the facility can perform full energy injection and reduces the transient behavior between shifts, opening the possibility of top-up injection mode. 4) The stability of electron beam has been improved. With the raise of electron beam position monitors (EBPM) resolution to better than 1μm, the reduction of both air and cooling water temperature fluctuations to less than ±0.1 , and the °C implementation of the global feedback system, the beam orbit stability of ~ 1μm with a drift of ~ 5μm in a single shift is routinely achievable now.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    1
    Citations
    NaN
    KQI
    []