Experience of Implementing a PGU-200 MW Two-Boiler One-Turbine Unit at the South-West CHP

2014 
The engineering solutions for PGU-200 MW unit, the electrical distribution system layout, and the results of implementing the SPPA-T3000 control system are presented. The results of performance adjustment confirm that the requirements by the System Operator of the Unified Power System are met. The organizational structure for operating personnel is described.