A study on the establishment of stress limit values of management monitoring in tunnel

2015 
ABSTRACT: This study analyzed a monitoring data, based on the initial limit values of monitoring in subway, of earth pressure and pore water pressure. The data is obtained from 8 sections of the Seoul metropolitan subway line No 6, 7 and 9 in about 5 years. Also, a research is performed to set up the limit values of management monitoring, which will be applied to management monitoring in tunnel, through comparing the limit values of overseas management monitoring data and that of domestic management monitoring data. And the result obtained from comparison show that the safety phase is 60% of allowable pressure, the attention phase is 80% of allowable pressure and the precision analysis phase is 100% of allowable pressure. Also, we presented a method of management monitoring by the absolute value which can be easily applied easily in practical affairs.Keywords: Management monitoring in tunnel, Pressure limit values, Earth pressure, Pore water pressure 초 록: 본 논문은 터널 유지관리계측의 압력 관리기준치 설정에 대한 연구로 계측 초기에 설정된 지하철계측 초기 관리기준치를 토대로 서울지하철 6,7,9호선 8개 대표단면의 터널 콘크리트라이닝의 토압과 간극수압에 대하여 약 5년에 걸친 계측 실적을 분석하고, 국외 계측관리기준을 비교하여 향후 터널 유지관리계측에 적용할 압력 계측관리기준치 설정에 대한 연구를 수행하였다. 연구결과 향후에 터널에 적용할 유지관리계측의 압력 관리기준치는 국내적용 계측관리기준치와 국외적용 계측관리기준치 분석결과를 비교하여 안전단계는 허용압력의 60%, 주의단계는 허용압력의 80%, 정밀분석단계는 허용압력의 100%로 실무에서 쉽게 적용할 수 있는 절대치에 의한 계측관리방법을 제안하였다. 주요어: 터널 유지관리계측, 압력 관리기준치, 토압, 간극수압Copyright ⓒ2016, Korean Tunnelling and Underground Space Association
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    7
    References
    0
    Citations
    NaN
    KQI
    []