RaD Status of the 700 MHz, 1MW Klystron for PEFP
2005
KAPRA (Korea Accelerator and Plasma Research Association) are undertaking the first phase R&D for the 1 MW, CW 700 MHz klystron, which is targeting the future stage of the PEFP (Proton Engineering Frontier Project) accelerator at KAERI (Korea Atomic Energy Research Institute). The objectives of the first phase R&D are 1) setting up infra structures/procedures for the design and fabrication, 2) developing a prototype klystron for proofs of principles, and 3) making a performance test of the prototype at a reduced duty. The second phase R&D is supposed to cover full power, CW operation and reliability issues. In this paper, a summary of the R&D status during the first phase for PEFP 1 MW, 700 MHz klystron is reported.
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
2
References
1
Citations
NaN
KQI