Case Analysis of Waste Heat Utilization of Sintering Plant and Steam Turbine Driving for Main Exhauster
2012
Taking for examples such as the Xiangsteel 2×360 m2 sintering waste heat generation,the steam turbine driving for Yanshansteel phase three sintering main exhauster and the combined steam turbine-motor driving for the main exhauster of 200 m2 sinter machine of Binxin Special Steel Material Co.,Ltd of Jiangsu,several typical applications of sintering waste heat boiler steam and present condition and rationality on using steam turbine for driving of sintering main exhauster were analyzed.