Initial Results of BDS3 GEO Orbit Determination with Inter-satellite Link Measurements

2020 
Owning to some successful applications of RDSS and RNSS, keeping GEO satellites in BeiDou Navigation Constellation becomes one of the key differences between BDS and other Global Navigation Satellite Systems (GNSS). And for the first time, BDS GEO works as a node of Inter-Satellite Links. It makes precise orbit determination (POD) based on Inter Satellite Ranging (ISR) for GEO possible. Orbit, hardware delay and solar radiation pressure parameters are estimated in POD process. Mean value of estimated hardware delay is 1189.18 ns and STD is 0.15. RMS of post-fit residuals of ISR, between 10 of 18 MEO satellites and GEO satellite is less than 45 cm, and that between the other 8 MEO satellites and GEO satellite is less than 56 cm. RMS of GEO 48-h OOD is no greater than 2.4 m in position and no greater than 0.2 m in radial direction.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    17
    References
    0
    Citations
    NaN
    KQI
    []