Development of Performance Prediction Method for Bridge and Tunnel Management Decision-making

2016 
In this study, using the Cost Prediction Model and Performance Prediction Model have developed a way to estimate future management costs and performance for bridge and tunnel by Network Level. Studies to date have primarily focused on the single facility, it is difficult to apply to the analysis of the Network Level. This study, items used as an index of `Special Act for the Safety Control of Public Structures` was added to Usability and Functionality to Status. Action period and annual budget for each facility can be estimated through the Basic and Advanced analysis. In addition, we verified the technical feasibility through case analysis.