Construction device for full casing construction method
2011
The utility model provides a construction device for a full casing construction method. The construction device for the full casing construction method comprises soil taking equipment and a pipe rubbing drill, wherein the pipe rubbing drill is installed on the machine body of the soil taking equipment through a connecting component; and the power source of the pipe rubbing drill is a power element of the soil taking equipment. In the construction device for the full casing construction method, the pipe rubbing drill is adhered to the soil taking equipment and the soil taking equipment serves as the power of the pipe rubbing drill, so that the production cost is reduced; and in the working process, convenient and quick installation and movement can be realized through the hoisting and walking capability of the soil taking equipment, and in combination with the drilling capability of the soil taking equipment, high-efficiency drilling can be realized, so that the construction efficiency is obviously improved.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI