Design and implementation of the BESIII detector-control system

2008 
Abstract In the upgrade project of the Beijing Electron-Positron Collider (BEPCII), a novel Detector-Control System (DCS) for the Beijing Spectrometer (BESIII) has been built and started its successful operation for the BESIII Commissioning. The main task of the DCS is to monitor and control the status of the BESIII detector and to guarantee a safe operation of the detector. The DCS must provide a uniform and coherent interface to detector operators even though there are a large number of distributed I/O channels from a large variety of equipments. For this reason, the DCS is hierarchically organized and divided into three layers: front-end layer (FEL), local control layer (LCL) and global control layer (GCL). In the FEL, devices ranging from simple sensors up to complex computer-based devices like embedded systems and programmable logical controllers (PLC) are utilized. A LabVIEW-based software framework has been developed for the LCL. Network communication and web server technologies have been used for the GCL. This paper will give a detailed introduction to the design and implementation of the DCS. Its performance and reliability will also be discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    10
    Citations
    NaN
    KQI
    []