Railway timetabling: a maximum bottleneck path algorithm for finding an additional train path

2020 
We present an algorithm to insert a train path in an existing railway timetable close to operation, when we want to affect the existing (passenger) traffic as little as possible. Thus, we consider all other trains as fixed, and aim for a resulting train path that maximizes the bottleneck robustness, that is, a train path that maximizes the temporal distance to neighboring trains in the timetable. Our algorithm is based on a graph formulation of the problem and uses a variant of Dijkstra’s algorithm. We present an extensive experimental evaluation of our algorithm for the Swedish railway stretch from Malmo to Hallsberg. Moreover, we analyze the size of our constructed graph.