Formwork for top-section of diversion bottom outlets of Jinghong Dam

2007 
The five diversion bottom outlets of Jinghong dam are laid across the transverse joints of the dam,the top-section concrete of the bottom outlet is placed with un-stripping and backside hoisting steel-lined formwork for speeding up the construction progress,the details are described.