Toshiba robotic inspection technology for turbo-generator

2019 
In conventional detailed inspections of generators, the rotor had to be removed from the stator, and then an inspection had been carried out by certified inspectors. This process took about one month. Reducing inspection time and extending the inspection cycle are challenges faced when trying to increase the availability of generators.