Determining Priorities Concerning Water Distribution Network Rehabilitation

2017 
Abstract This paper analyses the selection of priorities in case of the rehabilitation of water distribution networks. The ranking of the technical solutions was performed using the Leader method. This paper also presents a case study regarding the rehabilitation of water distribution network in Cluj-Napoca, Romania. The result of this study shows that the rehabilitation of water distribution network in Cluj-Napoca, Romania has to begin with the substitution of asbestos cement pipes.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    9
    References
    2
    Citations
    NaN
    KQI
    []