Activities for the remediation of TEPCO's Fukushima Daiichi nuclear power plant

2013 
With the aim of fulfilling recovery work for the Fukushima Daiichi NPP, technological efforts have been made for the development of a survey robot system, adequate communication infrastructure technologies, high radiation environment compatible gamma cameras, heavy machinery-type robots (ASTACO-SoRa), remote decontamination devices (AROUNDER), and contaminated waste water treatment system. We have developed a new type of absorbents which remove cesium (Cs) and strontium (Sr) simultaneously at a high removal rate of 99 % or more. We will provide valuable solutions and rational systems for waste water treatment using this developed adsorbent as well as other various adsorbents for the recovery of Fukushima Daiichi NPP.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []