Twin waterproofing system ensures dry basement for Goldsmiths

2010 
A twin waterproofing system was specified in the construction of the basement at the new DMC Building at Goldsmiths, University of London. The basement is 4.5m deep and extends to the complete 1800m 2 footprint of the new, two-storey building above.
    • Correction
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []