Economic evaluation of advanced limestone, Davy S-H, and Dowa Gypsum-producing FGD processes

1984 
Economic evaluations were made of three gypsum-producing FGD processes: advanced limestone (in-loop forced oxidation with adipic acid additive), Davy S-H (lime), and Dowa (aluminum sulfate, limestone). For a 500-MW power unit burning 3.5% sulfur coal and meeting the 1979 NSPS, capital investments in 1982 costs are 93 M$ (186 $/kW) for the advanced limestone process, 116 M$ (231 $/kW) for the Davy S-H process, and 121 M$ (243 $/kW) for the Dowa process. First-year annual revenue requirements in 1984 costs for these processes are 26, 33, and 32 M$ (9.4, 11.9, and 11.7 mills/kWh), respectively. The lower capital investment and annual revenue requirements of the advanced limestone process is due in part to the use of adipic acid, which allows partial scrubbing at 95% removal. The Davy S-H has slightly higher annual revenue requirements than the Dowa process because lime rather than limestone is used. Changes in power unit size and coal sulfur content affect the costs of all three processes similarly. The Davy S-H process is more sensitive to raw material costs because lime is used. Landfill waste disposal is a minor cost element in all three processes. 103 references, 26 figures, 30 tables.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []