The purpose of this paper was to analyse the operation of a wind farm and the wind turbine yields with a total capacity of 46.5 MW. The analysis was divided into two stages: (1) the general characteristics of the facility, which included: a) distribution of wind speeds and the method of calculation and visualisation of the estimated electricity production, b) evaluation of the wind farm operation as per type of tested turbine and the wind farm terrain and (2) the impact of the facility on the quality of electricity in the distribution network.