A Practical Method for Timetable Rescheduling in Subway Networks during the End-of-Service Period
2018
This study proposes a biobjective optimization method for timetable rescheduling during the end-of-service period of a subway network, taking all stakeholders’ interests into consideration. We seek to minimize the total transfer waiting time for all transfer passengers, meanwhile minimizing the deviation to the scheduled timetable. The e-constraint method and linearization techniques are utilized to obtain the approximate Pareto optimal solutions within limited seconds, allowing for figuring out the trade-off between the two objectives. The method is validated by numerical experiments for different delay scenarios based on a real-world case: the Beijing subway network.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
27
References
3
Citations
NaN
KQI