Piles Under Ultimate Loads
2021
During the construction of a bored pile, the remove of soils by machines may cause the soil residue to remain in the drilled hole. This leads to a decrease in the end resistance capacity of the pile and an increase of pile settlement.
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
6
References
0
Citations
NaN
KQI