Antarctic subglacial drill rig. Part II: Ice and Bedrock Electromechanical Drill (IBED)

2020 
A new, modified version of the cable-suspended Ice and Bedrock Electromechanical Drill (IBED) was designed for drilling in firn, ice, debris-rich ice and rock. The upper part of the drill is almost the same for all drill variants and comprises four sections: cable termination, a slip-ring section, an antitorque system and an electronic pressure chamber. The lower part of the IBED comprises an auger core barrel, reamers, a core barrel for ice/debris-ice drilling and a conventional geological single-tube core barrel or custom-made double-tube core barrel. First, the short and full-scale field versions of the IBED were tested at an outdoor testing stand and a testing facility with a 12.5 m-deep ice well. Then, in the 2018–2019 summer season, the IBED was tested in the field at a site ~12 km south of Zhongshan Station, East Antarctica, and a ~6 cm bedrock core was recovered from a 198 m-deep borehole. A total of 18 d was required to penetrate the ice sheet. The retrieved core samples of blue ice, basal ice and bedrock provided valuable information regarding the Earth's paleo-environment.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    24
    References
    2
    Citations
    NaN
    KQI
    []