Post LS1 schedule
2014
The scheduling limits for a typical long year taking into account technical stops, machine development, special physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
2
Citations
NaN
KQI