Deformation of the Zhangjiazhuang high-speed railway tunnel: an analysis of causal mechanisms using geomorphological surveys and D-InSAR monitoring

2021 
On 18 January 2016, the Zhangjiazhuang high-speed railway tunnel in Ledu, Qinghai Province, China, underwent serious deformation and structural damage. A crack formed at the top of the tunnel and the concrete on the crown peeled off. As a result, the tunnel could not be operated for three months. In order to determine the types and spatial distribution of the landslides in the region and the surface deformation characteristics associated with the tunnel deformation, we used field geological and geomorphological surveys, unmanned aerial vehicle image interpretation and differential interferometric synthetic aperture radar (D-InSAR) surface deformation monitoring. Nine ancient and old landslides were identified and analysed in the study area. Surface deformation monitoring and investigation of buildings in several villages on the slope front showed that the tunnel deformation was not related to deep-seated gravitational slope deformation. However, surface deformation monitoring revealed an active NEE-SWW fault in the area intersecting the tunnel at the location of the tunnel rupture. This constitutes a plausible mechanism for the deformation of the tunnel. Our study highlights the need for detailed engineering geomorphological investigations to better predict the occurrence of tunnel deformation events in the future.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    48
    References
    1
    Citations
    NaN
    KQI
    []