A Novel Dynamic Task Scheduling Algorithm in Grid Environments

2008 
Existing task scheduling algorithm need to be improved,for its having ignored the characteristic of grid.To mitigate this problem,a local objective function which can be adjusted was proposed by incorporating the makespan and resource credit.A novel heuristic dynamic task scheduling algorithm called as TSAMRC was presented.The simulative result shows that performance of the algorithm significantly outperforms the previous approaches in grid environment.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []