SHEAR TRANSFER MECHANISM OF PHC PILE TO PILE CAP CONNECTION : Study of the improvement in the bearing capacity and ductility of the prestressed high strength concrete (PHC) pile, Part 3

1989 
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    1
    Citations
    NaN
    KQI
    []