Performance of antiproton injection and extraction transfer lines of the Recycler Ring at Fermilab

2003 
The Recycler Ring, an 8 GeV antiproton accumulator, is being commissioned at Fermilab. Antiproton transfers in and out of the Recycler Ring take place through two transfer lines connecting the Recycler to the Main Injector. Transfer line layout and operation of beam transfers will be described. Particular attention has been paid to injection mismatch effects, in order to limit emittance growth during transfers. A considerable improvement has been achieved by removing vacuum windows, previously present in both transfer lines.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    0
    Citations
    NaN
    KQI
    []