A heuristic algorithm for minimizing maintenance workforce level
1999
We develop a heuristic algorithm for minimizing the workforce level required to accommodate all the maintenance jobs requested within a specific time interval. Each maintenance job has its own release and due dates as well as the required man-days, and must be scheduled in a noninterrupted time interval, i.e. without preemption. However, the duration of each job is not fixed, but to be determined within a specific range. We show that this problem can be seen as a variant of the two-dimensional bin-packing problem with some additional constraints. We develop a non-linear mixed integer programming model for the proposed problem, and employ some well-known bin-packing algorithms to develop an efficient heuristic algorithm. In order to evaluate the performance of the proposed heuristic, we present a computationally efficient scheme for getting a good lower bound for the actual minimum. The computational experiment shows that the proposed heuristic algorithm performs quite satisfactorily in practice.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
6
References
8
Citations
NaN
KQI