Analysis of 330MW CFB Unit Combustion Adjustment Test Parameter

2012 
According to the analysis of the test result of the running parameters-control,the trend of 330MW CFB unit running parameters with load is described.By means of the analysis of the parameter,the empirical data of optimization of technology has been provided.With the manufacturing industry of China's power generation equipment,production,R D and optimization provide experience to support the transformation of all sectors.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []