Pseudospark switch development for the LHC extraction kicker pulse generator

1996 
CERN, the European Laboratory for Particle Physics, has started construction of the Large Hadron Collider (LHC), a superconducting accelerator that will collide protons at a center of mass energy of 14 TeV from the year 2005 onwards. The kicker magnet pulse generators of the LHC beam extraction system require fast high power switches. One possible type is the pseudospark switch (PSS) which has several advantages for this application. A PSS fulfilling most of the requirements has been developed in the past years. Two outstanding problems, prefiring at high operating voltages and sudden current interruptions (quenching) at low voltage could have been solved recently. Prefiring can be avoided for this special application by conditioning the switch at two times the nominal voltage after each power pulse. Quenching can be suppressed by choosing an appropriate electrode geometry and by mixing Krypton to the D/sub 2/ gas atmosphere. One remaining problem, related to the required large dynamic voltage range (1.7 kV to 30 kV), is under active investigation; steps in forward voltage during conduction, occurring at low operation voltage at irregular time instants and causing a pulse to pulse jitter of the peak current. This paper presents results of electrical measurements concerning prefiring and quenching and explains how these problems have been solved. Furthermore the plans to cure the forward voltage step problem are discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    15
    Citations
    NaN
    KQI
    []