2 MW 110 GHz ECH heating system for DIII-D

1990 
A 2 MW 110 GHz ECH system using Varian 0.5 MW gyrotrons is under construction for use on the DIII-D tokamak by late 1991. Most of the components are being design and fabricated at General Atomics, including the gyrotron tanks, superconducting magnets, and transmission line. These components are intended for operation with 10 second pulses and, in the future, with 1 MW gyrotrons. 6 refs., 5 figs.