A surface water management model for the Integrated Southern Ghor Project, Jordan
2009
Purpose – The purpose of this paper is to assess the long‐term ability of the Integrated Southern Ghor Project (ISGP) to meet the required water demands, assess the resulting energy requirements, pumping costs, water transfers, benefits of the current system with respect to predevelopment conditions and effect of projected water demands increase on the resulting water deficits.Design/methodology/approach – A surface water resources management model is developed using dynamic programming. The model inputs are the hydrological inflows from the different wadis in the project area, reservoirs characteristics and evaporation rates, system water demands. The model outputs are water deficits at the different demand areas, reservoirs storage and release sequences, water transfers and energy requirements and the associated costs. The average annual values of different performance criteria with the annual frequency curves are used to evaluate the implications of different water scenarios on the ISGP.Findings – The ...
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
23
References
3
Citations
NaN
KQI