language-icon Old Web
English
Sign In

Slimhole sidetrack cuts costs

1999 
In December 1996, the decision was made to drill a slimhole well from the Brent Bravo platform with a slimhole drillstring. This well would test the technology and provide a direct comparison with two slimhole coiled tubing sidetracks successfully completed on the Brent Delta platform.
    • Correction
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []