Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Industries
2019
In Chaps. 3 and 4, mathematical models have been proposed for the capacitated lot sizing problem with production carryover and setup crossover across periods. Heuristics based on both the mathematical models have also been proposed. The models and heuristics address real-life situations in process industries such as production immediately after setup and uninterrupted production carryover across periods.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
20
References
0
Citations
NaN
KQI